The View
Thursday, November 12, 2015
Update
The lower level parking garage is poured.
1st floor steel studs are being installed.
2nd floor walls are being built
A View from the 2nd floor towards downtown.
Newer Posts
Older Posts
Home
Subscribe to:
Comments (Atom)