Update
The lower level parking garage is poured.
1st floor steel studs are being installed.
2nd floor walls are being built
A View from the 2nd floor towards downtown.
Monday, September 28, 2015
Friday, August 28, 2015
Friday, July 24, 2015
Lower Level Pre-Cast
The pre-cast over the lower level parking garage is set. The masons and concrete guys are getting the next layer of the foundation started.
Wednesday, July 15, 2015
Monday, July 6, 2015
Foundation
The lower parking garage is nearly complete. Just pouring the last of the column pads. About half of the garage walls have been painted.
Tuesday, June 30, 2015
Lower foundation
We are nearing completion of the lower foundation. The last section of wall will be poured Thursday with pre-cast starting 7/9. The bearing block walls are also being installed.
Tuesday, June 23, 2015
Update
Most of the foundation has been back filled. We are prepping the footings by the overhead garage door and forming more foundation walls.
Friday, June 5, 2015
Wednesday, May 27, 2015
Thursday, May 21, 2015
Monday, May 18, 2015
Foundation
About half of the footings have been poured. The elevator shaft is getting ready to be poured tomorrow.
Rebar is going in for the foundation walls.
Wednesday, May 13, 2015
Footings
The footings are starting to get formed and should start pouring concrete towards the end of the week.